Project Details

  • Client: JCT Design and Build for British Airways
  • Value: £2.5M
  • Duration: 8 Months
  • Completion: May - October 2021

Categories

Share

British Airways Maintenance Centre – Cardiff Airport (Rhoose)

We delivered the restoration and refurbishment of hangars located at Cardiff (Rhoose) Airport on behalf of British Airways, as a new maintenance centre for their fleet.

This was a multi-phase design and build contract, handed over on time and to standard. This included restoring the existing steel structures, repartitioning, refurbishing to client specification, including M&E, for a state-of-the-art aviation workshop, adjacent offices and facilities.